Guidelines

Wasaaradda Isgaarsiinta iyo Technology

Ministry of Communication and Technology

Guidelines

Site registration application

Complete every field and attach the required documents.

Read the guidelines first

01

Contact details

Details of the person submitting this file.

+252

Somaliland numbers only. Country code +252, then 9 digits.

02

Site details

Where the tower will be built.

Select the district to zoom the map there. Then save GPS or tap the map to place the pin.

Location saved

03

Tower details

The same technical fields operators give on the ministry registry form.

New towers in inhabited areas must be at least 30 m. Rooftop sites may be lower.

Power source

Select all sources used at this site. A tower can have more than one.

04

Distances from the site

Filled distances cannot be below the guideline: house 6 m, school or hospital 13 m. The location map must also show schools, hospitals and playgrounds within 15 m.

Guideline minimum: 13 m.

Guideline minimum: 13 m.

Guideline minimum: 6 m.

05

Supporting documents

PDF, Word, JPG or PNG. Maximum 10 MB each. All four are compulsory.

All of them are compulsory, not optional.

Read the guidelines first